Insights Contact

Payment Rails

FedNow, File by File: API, pacs.008, Returns, Rules and Security

By SP Sankar

⏱ About a 6-minute read. Click “Read more” or “Sample file” whenever you want the details.

Sree’s credit union only connects to the Fed. So when Sree sends money late at night, it goes through FedNow and arrives in seconds.

  • Not a banker? Just look at the pictures and read the “In one line” boxes. That is enough to get the idea.
  • Work in banking or operations? Open “Read more” under each file and each payment type.
  • Product owner? Read the status codes, the “Status, rules, security and data” boxes and the product owner rows. Those are the decisions that land on your desk.
  • Developer? Open every “Sample file”, then read the data mapping section and the developer rows.
  • Operations or support? Use the runbook table: what to watch at each file, and who acts.
  • Tester? Use the “What to test” rows as your starting checklist.
  • Forward deployed engineer? Jump to “For forward deployed engineers”. It covers what to ask the client, set-up, testing, go-live and where things usually go wrong.

How FedNow works

In one line: The Federal Reserve’s instant payment service. Same idea as RTP, run by the Fed.

CUSTOMERYOUR BANK · INTERNALOUTSIDE · EXTERNALCustomerapp / ERPany time, 24/7GatewayAPIreal-timeValidate+ mapto one internalpayment recordChecks+ postfraud · OFACfunds in secondsFedNowvia FedLineReceivingbankreplies fastAPI JSON · pain.001pacs.008pacs.008COMING BACKpacs.002 · camt.056 · pacs.004API status · webhookReconcile: bank books vs networkFed master account = FedNow totalsStatementcamt.054 · BAI2settlement reportwhat the networksays movedInstant and final · request for payment uses pain.013 / pain.014ledger postings
FedNow: what comes in, what goes out, what comes back, and how the bank checks it all matches.
  • Coming in: an API call (JSON) or a pain.001.
  • Going out: a pacs.008, sent over FedLine.
  • Coming back: a pacs.002. A camt.056 to ask for money back, and a pacs.004 when it is returned.

Status, rules, security and data

Status flowRequested → Checked → Sent → Accepted → Settled, final
Side paths: Rejected, Return requested, Returned (pacs.004)
Regulation and rulesRegulation J (subpart C). Federal Reserve Operating Circular 8. Regulation E for consumers. OFAC sanctions.
Security standardsAccess through FedLine, checked every year under the Fed’s Assurance Program (Operating Circular 5). The bank must test and certify with the Fed, and set its own transaction limits.
Data governanceIt uses the same ISO 20022 data as the Fed’s other services. Keep message IDs and UETRs for investigations.
Read more: FedNow

For tech teams, product owners and testers

For developersReuse your RTP instant path, but follow FedNow’s message guidelines. Support receive-only mode if the bank starts that way.
For product ownersSend and receive, or receive only. Limits. Running around the clock.
What to testThe same as RTP, plus limit settings and how receive-only works.

Step by step

  1. The app or system calls the bank’s API, or sends a pain.001.
  2. Within seconds, the bank checks for fraud, sanctions, its own limits and enough money.
  3. The bank sends a pacs.008 to FedNow over FedLine.
  4. FedNow checks the message and the bank’s limits. Then the receiving bank accepts or rejects it.
  5. FedNow settles the payment between the banks’ accounts at the Fed. A pacs.002 confirms it.
  6. The customer is told straight away. Returns use camt.056 (the request) and pacs.004 (the money coming back).
  7. The bank checks its Fed account against the FedNow reports.

When things go wrong: rejected, returned, cancelled

Not every payment goes through. On FedNow, there are three ways a payment can fail. Each one means something different for the money.

FedNow: rejected, returned and cancelledRejectedin secondsBank, Fed or receiver noMoney never movespacs.002App shows whyAPI / webhookReturnedafter sendingSender asks for it backcamt.056Other bank decidesMoney back, or nopacs.004 / camt.029Cancelledby the senderNot sent yet?cancel in appAlready sent?finalAsk for it backcamt.056Rejected = money never moved · Returned = money moved, then came back · Cancelled = stopped (or recalled) by the sender
Navy: the money never moved. Blue: it moved and came back. Grey: the sender stopped it.

Rejected. Three places can say no in seconds: the sending bank (fraud, limits, money), FedNow itself (bad message, over the bank’s limit) or the receiving bank (closed account, can’t receive). The answer is a pacs.002 with RJCT, and no money moves.

Returned. FedNow payments are final. To get money back, the sending bank sends a camt.056 return request. If the receiving bank agrees, the money comes back as a pacs.004. If not, it answers with a camt.029.

Cancelled. Only a payment that hasn’t been sent can be cancelled. After that, use the return request.

Codes you will see: AC03/AC04 wrong or closed account · AM04 not enough money · AB05 timed out · DUPL duplicate · FRAD fraud

Which files carry the bad news?

Each path has its own file or message. Here is what travels, who sends it, and what is inside.

PathFile or messageFrom → toWhat it says
Rejectedpacs.002 (RJCT)Receiving bank or FedNow → sending bankRejected in seconds, with reason
Rejectedadmi.002FedNow → bankMessage badly formed
Returnedcamt.056 (return request)Sending bank → receiving bankPlease send it back
Returnedpacs.004 or camt.029Receiving bank → sending bankThe money back, or “no”
Sample file: pacs.002 with RJCT

Fictional data, shortened. Real files carry more fields.

<Document xmlns="urn:iso:std:iso:20022:tech:xsd:pacs.002.001.10">
 <FIToFIPmtStsRpt>
  <GrpHdr><MsgId>FED-STS-88120</MsgId><CreDtTm>2026-11-20T10:02:11</CreDtTm></GrpHdr>
  <TxInfAndSts>
   <OrgnlInstrId>SND-20261120-0007</OrgnlInstrId>
   <OrgnlEndToEndId>INV-7781</OrgnlEndToEndId>
   <OrgnlUETR>3f1c9d2e-7b4a-4c1e-9a55-2d8e6f0b1a77</OrgnlUETR>
   <TxSts>RJCT</TxSts>
   <StsRsnInf><Rsn><Cd>AC04</Cd></Rsn></StsRsnInf>   <!-- account closed -->
  </TxInfAndSts>
 </FIToFIPmtStsRpt>
</Document>
Sample file: admi.002 message rejected

Fictional data, shortened. Real files carry more fields.

<Document xmlns="urn:iso:std:iso:20022:tech:xsd:admi.002.001.01">
 <admi.002.001.01>
  <RltdRef><Ref>SND-20261120-0007</Ref></RltdRef>
  <Rsn>
   <RjctgPtyRsn>FF01</RjctgPtyRsn>                  <!-- message format not valid -->
   <RsnDesc>Mandatory element missing</RsnDesc>
  </Rsn>
 </admi.002.001.01>
</Document>
Sample file: camt.056 “please return it”

Fictional data, shortened. Real files carry more fields.

<Document xmlns="urn:iso:std:iso:20022:tech:xsd:camt.056.001.08">
 <FIToFIPmtCxlReq>
  <Assgnmt>
   <Id>CXL-20261120-0004</Id>
   <Assgnr><Agt><FinInstnId><ClrSysMmbId><MmbId>222333445</MmbId></ClrSysMmbId></FinInstnId></Agt></Assgnr>
   <Assgne><Agt><FinInstnId><ClrSysMmbId><MmbId>123456780</MmbId></ClrSysMmbId></FinInstnId></Agt></Assgne>
   <CreDtTm>2026-11-20T11:15:00</CreDtTm>
  </Assgnmt>
  <Undrlyg><TxInf>
   <CxlId>CXL-0004-1</CxlId>
   <OrgnlEndToEndId>INV-7781</OrgnlEndToEndId>
   <OrgnlUETR>3f1c9d2e-7b4a-4c1e-9a55-2d8e6f0b1a77</OrgnlUETR>
   <OrgnlIntrBkSttlmAmt Ccy="USD">1250.50</OrgnlIntrBkSttlmAmt>
   <CxlRsnInf><Rsn><Cd>DUPL</Cd></Rsn></CxlRsnInf>   <!-- sent twice by mistake -->
  </TxInf></Undrlyg>
 </FIToFIPmtCxlReq>
</Document>
Sample file: pacs.004 payment return

Fictional data, shortened. Real files carry more fields.

<Document xmlns="urn:iso:std:iso:20022:tech:xsd:pacs.004.001.10">
 <PmtRtr>
  <GrpHdr>
   <MsgId>RTN-20261120-0031</MsgId><CreDtTm>2026-11-20T14:20:00</CreDtTm>
   <NbOfTxs>1</NbOfTxs><SttlmInf><SttlmMtd>CLRG</SttlmMtd></SttlmInf>
  </GrpHdr>
  <TxInf>
   <RtrId>RTN-0031-1</RtrId>
   <OrgnlInstrId>SND-20261120-0007</OrgnlInstrId>
   <OrgnlEndToEndId>INV-7781</OrgnlEndToEndId>        <!-- links to the original -->
   <OrgnlUETR>3f1c9d2e-7b4a-4c1e-9a55-2d8e6f0b1a77</OrgnlUETR>
   <RtrdIntrBkSttlmAmt Ccy="USD">1250.50</RtrdIntrBkSttlmAmt>
   <IntrBkSttlmDt>2026-11-20</IntrBkSttlmDt>
   <RtrRsnInf><Rsn><Cd>AC04</Cd></Rsn></RtrRsnInf>    <!-- account closed -->
  </TxInf>
 </PmtRtr>
</Document>

FedNow runbook: what to watch at each file

This is the day-to-day runbook for the files above, in the same order. For each step: the file you are looking at, what “good” looks like, what to do when it isn’t, and who acts. L1 is the service desk, L2 is payment operations and app support, and L3 is engineering.

StepFileCheckIf it goes wrongWho
1. API requestJSON with an idempotency keyKey is present and new, request is valid.Same key again? Return the first result, never pay twice.L3 owns the code, L2 watches
2. Checks in secondsInternal recordFraud, sanctions, the bank’s own limits and money.Over the limit? Reject with a clear message.L2
3. Send over FedLinepacs.008pacs.002 back in time. No admi.002.admi.002? The message is broken: fix the code, not the payment.L2 and L3
4. Tell the customerAPI response and webhookFinal status reaches the app.Webhook failing? Retry, then alert.L2 and L3
5. Return requestscamt.056, camt.029, pacs.004Answered on time, linked to the original.Fraud case? Move fast and keep evidence.L2 with fraud team
6. ReconcileFed account and FedNow reportsSent equals settled, every day, weekends too.Break? Open an item and own it until it’s closed.L2 with finance

Golden rules

  • Instant means final. Check fraud before you send.
  • A timeout is “unknown”, not “failed”.
  • Keep the FedLine security attestation current every year.

Want the full picture, from building it to running it live? Read the Instant Payments Runbook: RTP and FedNow. For a plain explainer, see How RTP and FedNow Work.

For forward deployed engineers (FDE)

As an FDE, you sit with the client and make the integration actually work. Here is your checklist for this rail.

First call with the clientSend and receive, or receive only? Limits per payment? Which payments go by FedNow and which by RTP?
Set up and connectivityOn the client side, the same API set-up as RTP. On the bank side, FedLine access and the yearly FedLine security attestation.
Test and certifyThe Fed’s customer testing and certification. The client tests rejects, returns (camt.056 and pacs.004) and limits.
Go-live and hypercareRaise limits step by step. Check the Fed account and reconciliation every day.
Where it usually breaksThe receiving bank is not on FedNow. The client and the bank have different limits. Returns that are not linked back to the original payment.

The files on this rail

Each file below shows how it starts, what is inside, its status codes and a sample. For all the other files, see the full guide: how payment files are processed in US banks.

API (JSON): real-time requests

In one line: How apps and fintechs start payments one at a time, especially instant ones.

  • How it starts: someone presses “Pay” in an app, or a platform calls the bank’s API.
  • What is inside: JSON with the amount, the accounts, the payee and a reference. The headers carry the security token and an idempotency key (a unique ID that stops the same payment going twice).
  • What happens next: the bank runs the same internal steps as for a file. It replies quickly, then sends a webhook later with the final status.
Sample file: API (JSON)

Made-up data, shortened. Real files have more fields.

POST /v1/payments
Authorization: Bearer <OAuth token>
Idempotency-Key: 6f1c2a90-7b1e-4d3a-9c55-7e0d9e5b1a11
Content-Type: application/json

{
  "rail": "RTP",
  "amount": { "value": "1250.50", "currency": "USD" },
  "debtor_account": "1112223334",
  "creditor": { "name": "Acme Supplies Inc.", "aba": "123456780", "account": "9876543210" },
  "end_to_end_id": "INV-7781",
  "remittance": "Invoice INV-7781"
}

HTTP/1.1 202 Accepted
{ "payment_id": "pmt_8KQ2", "status": "PENDING", "end_to_end_id": "INV-7781" }

Webhook a few seconds later:
{ "event": "payment.settled", "payment_id": "pmt_8KQ2", "status": "COMPLETED",
  "network_reference": "8a562c67-ca16-48ba-b074-65581be6f001" }
Read more: API (JSON)

For tech teams, product owners and testers

For developersUse OAuth 2.0 and mutual TLS. Require an Idempotency-Key so a retry never pays twice. Reply with 202 (accepted), then send the final result by a signed webhook.
For product ownersAn API needs rate limits, a sandbox, versioning and clear error codes. Treat it as a product, not just a pipe.
What to testThe same Idempotency-Key sent twice. An expired token. A webhook that arrives twice or late. A timeout when the payment actually went through.

pacs.008 and pacs.009: bank-to-bank payment

In one line: The message one bank sends to the network to move money. pacs.008 is for a customer’s payment. pacs.009 is when the bank pays for itself.

  • How it starts: your bank creates it once all checks pass. It is built from the bank’s own internal payment record, not copied from the customer’s file.
  • Who uses it: Fedwire, CHIPS, RTP, FedNow and SWIFT for cross-border payments.
  • What is inside: the amount, the settlement date, the sending and receiving banks, who pays, who gets paid, the customer’s EndToEndId and a UETR (a unique tracking ID).
Sample file: pacs.008 and pacs.009

Made-up data, shortened. Real files have more fields.

<!-- Business Application Header (head.001) is sent with it -->
<Document xmlns="urn:iso:std:iso:20022:tech:xsd:pacs.008.001.08">
 <FIToFICstmrCdtTrf>
  <GrpHdr>
   <MsgId>20261120BANKOUT000123</MsgId><CreDtTm>2026-11-20T10:01:07</CreDtTm>
   <NbOfTxs>1</NbOfTxs>
   <SttlmInf><SttlmMtd>CLRG</SttlmMtd></SttlmInf>
  </GrpHdr>
  <CdtTrfTxInf>
   <PmtId>
    <InstrId>OUT-000123</InstrId>
    <EndToEndId>INV-7781</EndToEndId>             <!-- from the customer -->
    <UETR>8a562c67-ca16-48ba-b074-65581be6f001</UETR>
   </PmtId>
   <IntrBkSttlmAmt Ccy="USD">1250.50</IntrBkSttlmAmt>
   <IntrBkSttlmDt>2026-11-20</IntrBkSttlmDt>
   <ChrgBr>SLEV</ChrgBr>
   <InstgAgt><FinInstnId><ClrSysMmbId><MmbId>222333445</MmbId></ClrSysMmbId></FinInstnId></InstgAgt>
   <InstdAgt><FinInstnId><ClrSysMmbId><MmbId>123456780</MmbId></ClrSysMmbId></FinInstnId></InstdAgt>
   <Dbtr><Nm>Sree Corp</Nm>
    <PstlAdr><TwnNm>Edison</TwnNm><CtrySubDvsn>NJ</CtrySubDvsn><Ctry>US</Ctry></PstlAdr></Dbtr>
   <DbtrAcct><Id><Othr><Id>1112223334</Id></Othr></Id></DbtrAcct>
   <DbtrAgt><FinInstnId><ClrSysMmbId><MmbId>222333445</MmbId></ClrSysMmbId></FinInstnId></DbtrAgt>
   <CdtrAgt><FinInstnId><ClrSysMmbId><MmbId>123456780</MmbId></ClrSysMmbId></FinInstnId></CdtrAgt>
   <Cdtr><Nm>Acme Supplies Inc.</Nm></Cdtr>
   <CdtrAcct><Id><Othr><Id>9876543210</Id></Othr></Id></CdtrAcct>
   <RmtInf><Ustrd>Invoice INV-7781</Ustrd></RmtInf>
  </CdtTrfTxInf>
 </FIToFICstmrCdtTrf>
</Document>
Read more: pacs.008 and pacs.009

For tech teams, product owners and testers

For developersEvery network has its own rules for which fields are allowed, how long they can be and which characters are OK. Write one formatter per network, all fed from the same internal record. Keep a copy of the exact message you sent, for audit.
For product ownersBetter data, such as structured addresses and remittance details, means fewer false sanctions alerts and easier reconciliation. Decide how much of it your clients must give you.
What to testEach network’s required fields. Very long names and addresses. A missing UETR. A duplicate InstrId. A message sent after the network’s cut-off.

pacs.002: the network’s answer

In one line: The network’s answer about a bank-to-bank payment: accepted, settled, or rejected (with a reason).

  • How it starts: the network or the receiving bank sends it back. On instant rails it takes seconds. On wires it takes minutes.
  • Statuses: ACSC (settled), ACSP (in progress), ACWP (accepted, waiting to be posted) and RJCT (rejected, with a reason such as AC04, closed account).
Sample file: pacs.002

Made-up data, shortened. Real files have more fields.

<Document xmlns="urn:iso:std:iso:20022:tech:xsd:pacs.002.001.10">
 <FIToFIPmtStsRpt>
  <GrpHdr><MsgId>NET-ACK-778899</MsgId><CreDtTm>2026-11-20T10:01:09</CreDtTm></GrpHdr>
  <TxInfAndSts>
   <OrgnlInstrId>OUT-000123</OrgnlInstrId>
   <OrgnlEndToEndId>INV-7781</OrgnlEndToEndId>
   <OrgnlUETR>8a562c67-ca16-48ba-b074-65581be6f001</OrgnlUETR>
   <TxSts>ACSC</TxSts>          <!-- or RJCT with <StsRsnInf><Rsn><Cd>AC04</Cd> -->
  </TxInfAndSts>
 </FIToFIPmtStsRpt>
</Document>
Read more: pacs.002

For tech teams, product owners and testers

For developersMatch it to the message you sent using OrgnlInstrId, OrgnlEndToEndId or OrgnlUETR. Be ready for statuses that arrive late, twice, or in the wrong order.
For product ownersDecide what the customer sees at each status, and at what point you tell them the money is gone for good.
What to testA reject after a timeout. An answer that never arrives. Two answers for one payment. A reject reason you have never seen before.

camt.056, camt.029 and pacs.004: asking for money back

In one line: How one bank asks another to send a payment back, and how the money returns.

  • How it starts: the customer or the bank spots a mistake, such as a duplicate, a wrong amount or fraud, and asks for a recall.
  • camt.056 says “please return this payment.” camt.029 is the answer, and it is often “no.” pacs.004 is the money actually coming back, linked to the original payment.
  • Remember: wires and instant payments are final. The other bank does not have to say yes.
Sample file: camt.056, camt.029 and pacs.004

Made-up data, shortened. Real files have more fields.

<!-- Step 1: the sending bank asks for the money back (camt.056) -->
<FIToFIPmtCxlReq>
 <Undrlyg><TxInf>
  <CxlId>CXL-0042</CxlId>
  <OrgnlEndToEndId>INV-7781</OrgnlEndToEndId>
  <OrgnlUETR>8a562c67-ca16-48ba-b074-65581be6f001</OrgnlUETR>
  <CxlRsnInf><Rsn><Cd>DUPL</Cd></Rsn></CxlRsnInf>      <!-- sent twice by mistake -->
 </TxInf></Undrlyg>
</FIToFIPmtCxlReq>

<!-- Step 2a: the other bank says no (camt.029) ... -->
<!-- Step 2b: ... or sends the money back (pacs.004) -->
<PmtRtr>
 <TxInf>
  <RtrId>RTN-5511</RtrId>
  <OrgnlEndToEndId>INV-7781</OrgnlEndToEndId>
  <OrgnlUETR>8a562c67-ca16-48ba-b074-65581be6f001</OrgnlUETR>
  <RtrdIntrBkSttlmAmt Ccy="USD">1250.50</RtrdIntrBkSttlmAmt>
  <RtrRsnInf><Rsn><Cd>FOCR</Cd></Rsn></RtrRsnInf>       <!-- following cancellation request -->
 </TxInf>
</PmtRtr>
Read more: camt.056, camt.029 and pacs.004

For tech teams, product owners and testers

For developersA pacs.004 has to find the original payment using its EndToEndId and UETR. Then it reverses the posting and updates the status. The amount that comes back can be smaller if fees were taken.
For product ownersSet up the recall process: who can ask for one, how fast it happens, and how the customer is told. With fraud, every minute counts.
What to testA recall that is accepted. One that is refused. A partial return. A return for a payment you cannot find. A return in a different currency.

camt.052, camt.053 and camt.054: reports and statements

In one line: How the bank tells the customer what came in and what went out.

  • camt.052: a report during the day, sent several times.
  • camt.053: the end-of-day statement, with opening and closing balances.
  • camt.054: a notice for each debit or credit, sent as it happens.
  • Each line is either BOOK (posted) or PDNG (pending).
Sample file: camt.052, camt.053 and camt.054

Made-up data, shortened. Real files have more fields.

<!-- camt.054: one notice, sent as soon as the account is debited -->
<BkToCstmrDbtCdtNtfctn>
 <Ntfctn>
  <Acct><Id><Othr><Id>1112223334</Id></Othr></Id></Acct>
  <Ntry>
   <Amt Ccy="USD">1250.50</Amt>
   <CdtDbtInd>DBIT</CdtDbtInd>
   <Sts><Cd>BOOK</Cd></Sts>
   <BookgDt><Dt>2026-11-20</Dt></BookgDt>
   <ValDt><Dt>2026-11-20</Dt></ValDt>
   <NtryDtls><TxDtls><Refs><EndToEndId>INV-7781</EndToEndId></Refs></TxDtls></NtryDtls>
  </Ntry>
 </Ntfctn>
</BkToCstmrDbtCdtNtfctn>

<!-- camt.053: the end-of-day statement adds opening and closing balances -->
<Bal><Tp><CdOrPrtry><Cd>OPBD</Cd></CdOrPrtry></Tp><Amt Ccy="USD">50000.00</Amt><CdtDbtInd>CRDT</CdtDbtInd></Bal>
<Bal><Tp><CdOrPrtry><Cd>CLBD</Cd></CdOrPrtry></Tp><Amt Ccy="USD">48749.50</Amt><CdtDbtInd>CRDT</CdtDbtInd></Bal>
Read more: camt.052, camt.053 and camt.054

For tech teams, product owners and testers

For developersPut the customer’s EndToEndId and the bank’s reference on every entry. That is what the customer’s ERP uses to match payments. Use the standard bank transaction codes (BkTxCd).
For product ownersPick the format and timing for each type of client. For example, camt.053 for large companies, BAI2 for others and PDF for small businesses.
What to testOpening balance plus entries equals the closing balance. A reversal. A pending entry that books later. A day with no activity (the statement should still go out).

Read next

Sources: Federal Reserve Financial Services; The Clearing House; Nacha Operating Rules; Swift. Sample files are fictional and shortened.

Working on a payments project?

I help banks and fintechs deliver real-time payments, ISO 20022, and AI-driven AML and compliance change, from strategy to go-live.

Connect on LinkedInSee how I can help