Insights Contact

Country Guides

Asia Payments Compared: UPI, FAST and PayNow, Zengin, Alipay and WeChat Pay

By SP Sankar

Flag of IndiaFlag of SingaporeFlag of JapanFlag of China

Asia has some of the world’s biggest and oldest fast payment systems, built in very different ways. Japan has had near-instant bank transfers since 1973. China’s mobile wallets took over daily payments. India’s UPI became the world’s busiest instant system. Singapore linked its system to its neighbors.

In all four countries you can pay in seconds from your phone. Indians use UPI apps, Singaporeans use PayNow, Chinese shoppers use Alipay or WeChat Pay, and in Japan bank transfers go through the Zengin system, now open 24/7.

Part of my Country Payment Guides series. Rules change often, so always confirm with the regulator before you build.

Asia at a glance

CountryCurrencyMain fast way to paySinceWho runs it
IndiaIndian rupee (INR)UPI (and IMPS)2016 (UPI), 2010 (IMPS)NPCI, under the Reserve Bank of India
SingaporeSingapore dollar (SGD)FAST, with PayNow on top2014 (FAST), 2017 (PayNow)Banks, under the Monetary Authority of Singapore
JapanJapanese yen (JPY)Zengin System bank transfers1973; 24/7 since 2018Zengin-Net (bank-owned), under the Bank of Japan
ChinaRenminbi (CNY)Alipay and WeChat Pay wallets2004 (Alipay), 2013 (WeChat Pay)Tech companies, cleared through NetsUnion under the PBOC

Each country has its own currency and its own rules on moving money and data across borders. A regional product needs a separate setup for each one.

When fast payments arrived

Japan’s Zengin System came first in 1973. China’s wallets and India’s IMPS followed in the 2000s, then Singapore’s FAST and India’s UPI in the 2010s.

When fast payments arrived in Asia1973: Japan, Zengin System bank transfers1973Japan Zengin System bank transfers2004: China, Alipay wallet2004China Alipay wallet2010: India, IMPS instant bank transfers2010India IMPS instant bank transfers2010: China, IBPS, central bank online payments2010China IBPS, central bank online payments2014: Singapore, FAST instant transfers2014Singapore FAST instant transfers2016: India, UPI, the shared payments platform2016India UPI, the shared payments platform2017: Singapore, PayNow, pay by phone or ID number2017Singapore PayNow, pay by phone or ID number2018: Japan, Zengin opens 24/72018Japan Zengin opens 24/72018: China, NetsUnion clears all wallet payments2018China NetsUnion clears all wallet paymentsBank-run railApp or wallet on topShared public platform

Different ways to get to fast payments

ModelCountriesWhat it means for your product
A shared public platform, apps on topIndia (UPI)Any bank or app can join one platform run by NPCI, a non-profit owned by banks.
Bank networks with central bank oversightSingapore (FAST, PayNow), Japan (Zengin)Banks run the system together; the central bank sets rules and settles.
Big-tech wallets with central clearingChina (Alipay, WeChat Pay)Private wallets dominate daily payments; all wallet payments clear through NetsUnion.

What is the same everywhere

  • QR codes and simple IDs (phone number, ID number or UPI ID) replace long account numbers.
  • Central banks set the rules, even where private companies run the apps.
  • Cross-border links are growing, for example between Singapore’s PayNow and India’s UPI.
  • Data rules differ a lot, with strict localization in China and for payment data in India.

Tips for payments teams entering the region

  1. In India, build on UPI and expect very high volumes.
  2. In Singapore, support PayNow and the SGQR code.
  3. In China, accept Alipay and WeChat Pay; plan for data localization.
  4. In Japan, support Zengin transfers and local QR wallets.

Indonesia, Thailand, Malaysia, South Korea, Hong Kong, the Philippines and Vietnam all have their own fast payment systems. They aren’t covered here yet.

My take

Asia shows every model at scale: public platforms, bank networks and big-tech wallets. For payments teams, it means picking the right local rail in each market, not one regional answer.

Country guides

Other regions

Working on a payments project?

I help banks and fintechs deliver real-time payments, ISO 20022, and AI-driven AML and compliance change, from strategy to go-live.

Connect on LinkedInSee how I can help