
![]()
![]()
The Gulf’s two biggest economies have both built national instant payment systems in the last few years. In both, the central bank set up its own company to run them. Saudi Arabia’s sarie went live in 2021. The UAE’s Aani followed in 2023.
In both countries, you can now send money in seconds using a phone number or another simple ID. Saudis use sarie and pay in shops with mada cards. In the UAE, people use Aani and are getting a national card scheme, Jaywan.
Part of my Country Payment Guides series. Rules change often, so always confirm with the regulator before you build.
The Middle East at a glance
| Country | Currency | Main fast way to pay | Since | Who runs it |
|---|---|---|---|---|
| United Arab Emirates | UAE dirham (AED) | Aani instant payments | 2023 | Al Etihad Payments, a Central Bank of the UAE company |
| Saudi Arabia | Saudi riyal (SAR) | sarie instant payments; mada cards | 2021 (sarie instant) | Saudi Payments, a Saudi Central Bank (SAMA) subsidiary |
Both countries have their own currencies, so a regional product still needs separate accounts and settlement in each. The UAE also has financial free zones (DIFC and ADGM) with their own regulators.
When fast payments arrived
Both countries built central bank settlement systems first, then card networks, and only recently instant payments for everyone.
One shared model
| Model | Countries | What it means for your product |
|---|---|---|
| A central bank company runs national rails | UAE (Al Etihad Payments), Saudi Arabia (Saudi Payments) | One operator runs instant payments, cards and switches; strong central bank control and fast roll-out. |
What is the same everywhere
- Central bank-owned operators run the national instant systems in both countries.
- Simple IDs such as phone numbers replace long account numbers for instant payments.
- National card networks (mada in Saudi Arabia, Jaywan in the UAE) sit alongside Visa and Mastercard.
- Each country has its own AML and data protection laws.
Tips for payments teams entering the region
- In Saudi Arabia, support sarie and accept mada cards.
- In the UAE, support Aani and plan for Jaywan cards.
- Check whether your business falls under DIFC or ADGM rules in the UAE.
- Plan local data storage where rules require it.
Qatar, Bahrain, Kuwait, Oman, Egypt and other countries in the region have their own systems and are not covered yet.
My take
The Gulf shows how fast a central bank can move when it owns the operator. For payments teams, it means connecting early to Aani and sarie, and treating national card networks as must-haves.
Country guides
Other regions
Working on a payments project?
I help banks and fintechs deliver real-time payments, ISO 20022, and AI-driven AML and compliance change, from strategy to go-live.
Connect on LinkedInSee how I can help