Insights Contact

Country Guides

Africa Payments Compared: Nigeria NIP, South Africa PayShap and Kenya M-Pesa

By SP Sankar

Flag of NigeriaFlag of South AfricaFlag of Kenya

Africa’s three biggest payment markets reached fast payments in three different ways. Nigeria used a shared bank switch. Kenya used a telecom company’s mobile wallet. South Africa used a new low-cost instant scheme backed by the central bank.

In all three countries you can send money in seconds. Nigerians use bank transfers over NIP, Kenyans use M-Pesa on their phones, and South Africans can use PayShap with a simple ShapID.

Part of my Country Payment Guides series. Rules change often, so always confirm with the regulator before you build.

Africa at a glance

CountryCurrencyMain fast way to paySinceWho runs it
NigeriaNigerian naira (NGN)NIP instant bank transfers2011NIBSS, owned by banks and the Central Bank of Nigeria
South AfricaSouth African rand (ZAR)PayShap2023PayInc (formerly BankservAfrica), under the SARB
KenyaKenyan shilling (KES)M-Pesa mobile money; PesaLink for banks2007 (M-Pesa), 2017 (PesaLink)Safaricom (M-Pesa) and banks, licensed by the Central Bank of Kenya

Each country has its own currency, so a regional product needs separate accounts, licenses and settlement in each one.

When fast payments arrived

Central bank settlement systems came first. Kenya’s M-Pesa then showed what mobile money could do, Nigeria built instant bank transfers, and South Africa relaunched instant payments with PayShap.

When fast payments arrived in Africa1998: South Africa, SAMOS, central bank settlement1998South Africa SAMOS, central bank settlement2005: Kenya, KEPSS, central bank settlement2005Kenya KEPSS, central bank settlement2006: South Africa, Real-Time Clearing, instant but costly2006South Africa Real-Time Clearing, instant but costly2007: Kenya, M-Pesa mobile money2007Kenya M-Pesa mobile money2011: Nigeria, NIP instant bank transfers2011Nigeria NIP instant bank transfers2017: Kenya, PesaLink instant bank transfers2017Kenya PesaLink instant bank transfers2021: Nigeria, NQR national QR codes2021Nigeria NQR national QR codes2023: South Africa, PayShap low-cost instant payments2023South Africa PayShap low-cost instant payments2023: Kenya, KE-QR national QR standard2023Kenya KE-QR national QR standardBank or central bank railMobile money or QRInstant bank payments

Different ways to get to fast payments

ModelCountriesWhat it means for your product
A shared bank switchNigeria (NIP)Every bank connects to one instant system run by a company owned by the banks and the central bank.
A telecom-led mobile walletKenya (M-Pesa)A phone company runs the main way to pay; banks connect through PesaLink and QR codes.
A new scheme to make instant cheapSouth Africa (PayShap)The industry relaunched instant payments with simple IDs and lower costs.

What is the same everywhere

  • Mobile first: phones, USSD codes and QR codes matter more than cards.
  • Identity is key: national IDs and bank verification numbers drive onboarding.
  • Central banks license payment providers, and each country has its own AML and data protection law.
  • Fraud controls must work in real time, as money moves in seconds.

Tips for payments teams entering the region

  1. In Nigeria, build on NIP and support USSD.
  2. In Kenya, integrate with M-Pesa first.
  3. In South Africa, support PayShap alongside EFT and debit orders.
  4. Budget for licenses and data protection registration in each country.

Egypt, Ghana, Morocco, Ethiopia, Tanzania and others have their own instant systems and are not covered yet.

My take

Africa shows that fast payments do not need cards or even bank accounts to succeed. For payments teams, it means mobile-first design, local identity checks and the main local rail in each country.

Country guides

Other regions

Working on a payments project?

I help banks and fintechs deliver real-time payments, ISO 20022, and AI-driven AML and compliance change, from strategy to go-live.

Connect on LinkedInSee how I can help