
![]()
![]()
Australia and New Zealand were both early leaders in card payments, but they have moved at different speeds since. Australia launched its instant system, the NPP, in 2018. New Zealand still sends bank payments in batches, though it now settles them seven days a week.
In Australia you can send money in seconds to a PayID such as a phone number. In New Zealand bank transfers arrive the same day but not in seconds, and most shop payments are made with EFTPOS cards or contactless.
Part of my Country Payment Guides series. Rules change often, so always confirm with the regulator before you build.
Oceania at a glance
| Country | Currency | Main fast way to pay | Since | Who runs it |
|---|---|---|---|---|
| Australia | Australian dollar (AUD) | NPP, with PayID and PayTo | 2018 | Australian Payments Plus (AP+), settled at the Reserve Bank of Australia |
| New Zealand | New Zealand dollar (NZD) | EFTPOS and contactless cards; same-day bank transfers | No instant system yet | Payments NZ (BECS), settled at the Reserve Bank of New Zealand |
The two countries have separate currencies, central banks and payment systems, so a product needs a separate setup in each.
When fast payments arrived
Both countries started with EFTPOS cards in the mid-1980s and central bank real-time settlement in 1998. Australia added instant payments in 2018. New Zealand moved to seven-day payments in 2023 and open banking in 2025.
Two ways to modernize
| Model | Countries | What it means for your product |
|---|---|---|
| A national instant system | Australia (NPP) | Instant payments by PayID, plus PayTo for pulling payments with the customer’s permission. |
| Batch payments, open banking first | New Zealand | Same-day bank payments and regulated open banking; a real-time system is still being planned. |
What is the same everywhere
- Cards are strong: eftpos in Australia and EFTPOS in New Zealand are still widely used.
- Open banking is in place in both countries, with Australia’s Consumer Data Right as the model for New Zealand’s.
- Central bank real-time settlement has existed in both since 1998.
- Scams are a growing focus for regulators in both countries.
Tips for payments teams entering the region
- In Australia, support PayID and PayTo.
- In New Zealand, keep cards and use open banking payments online.
- Plan for same-day, not instant, bank payments in New Zealand today.
- Watch the Reserve Bank of New Zealand’s payments modernization plans.
Fiji, Papua New Guinea and other Pacific island countries have their own systems and are not covered yet.
My take
Oceania shows two neighbors at different stages: Australia already instant, New Zealand catching up through open banking first. For payments teams, it means PayID and PayTo in Australia, and cards plus open banking in New Zealand.
Country guides
Other regions
Working on a payments project?
I help banks and fintechs deliver real-time payments, ISO 20022, and AI-driven AML and compliance change, from strategy to go-live.
Connect on LinkedInSee how I can help