
Fewer people write checks now, but checks still carry large business payments, and they are a big fraud target. This is how I take a change to checks, or to depositing checks by photo, from idea to live, safely.
Most checks today clear as photos, not paper, and banks often make the money available before the check has fully cleared. That makes image quality, holds and fraud checks the key to running checks safely.
New here? Start with How a US Payment Works: 15 Steps Inside a Bank, then come back for the detail.
How a check clears today
Read from left to right. Each box is one step a deposited check takes, from the photo to final payment or return. The band at the bottom shows the controls that protect the bank. The customer usually gets the money before Step 4 confirms the check is good.
Checks in one minute
Checks keep falling, but they still matter. In 2024 there were 9.2 billion check payments worth $24.45 trillion. That is only 4% of noncash payments by number, but 17% by value. The average check was $2,653 (Federal Reserve Payments Study, July 2026). Almost every check now clears as an image, and most new work is in deposits by phone or office scanner, called remote deposit capture (RDC).
| Step | What happens | When |
|---|---|---|
| Capture | A photo of the check, plus the account numbers printed along the bottom (the MICR line), taken at a branch, ATM, phone or scanner | At deposit |
| Availability | Money added to the account, with any hold the rules allow | On the timetable set by Regulation CC (the US rule on when deposited money must be available) |
| Presentment | Presentment: the check photo is sent to the paying bank in a file called a cash letter, through the Fed, a clearing house or directly | Same or next business day |
| Pay or return | The paying bank pays or returns the check | Usually by midnight of the next business day |
Why checks are risky
Regulation CC makes banks release money quickly, often before the check has really cleared. From July 1, 2025, at least $275 of certain deposits must be available the next business day. If the check is fake, washed and rewritten, changed, or deposited twice, the bank can be left with the loss.
The checks that matter most: make sure the photo is clear, catch the same check deposited twice in any channel, set sensible limits for photo deposits, apply the right holds and tell the customer, offer positive pay to businesses, and use fraud tools that spot washed and fake checks. With positive pay, a business sends the bank a list of checks it wrote, and anything else gets flagged.
Building it: short cycles, firm checkpoints
- Test with messy photos, not just clean samples: bad light, folds, a missing signature on the back, foreign checks and fakes.
- Pass tests with every partner bank or clearing house for photo quality and file format before go-live.
- Prove it live. Employees deposit real low-value checks in every channel. A test check is returned. The same check is deposited twice to prove it gets caught.
| Gate | Done when |
|---|---|
| E2E exit | Partner tests passed, 95% or more of our tests passed, double deposits caught in every channel, holds and notices right, returned checks match |
| UAT exit | Exceptions, returns and fraud reviews signed by the people who do them |
| Go-live | Pilot checks paid or returned and all records match; limits, holds and positive pay live |
Running it live
The clock that matters is the presentment deadline, the time to send checks to the paying banks. Send alerts to Slack or Teams if a check file isn’t sent on time, a partner rejects a file, more photos get rejected, or double-deposit alerts jump. If the main site goes down, the backup site must take, bundle and send check photos before the next deadline, with none lost.
Download the full runbook (PDF, 12 pages)
Every phase in detail, with check clearing facts, Regulation CC, rules, exit criteria and sign-off, a live pilot plan, fraud and duplicate controls, alerts, incident runbooks, disaster recovery and audit checklists.
The files behind this runbook
Every part of this runbook touches the same handful of files. Here is where each one shows up. For what is inside each file, with samples and a step-by-step checklist, see Checks, file by file.
| File or moment | Where it matters in this runbook |
|---|---|
| Check image and MICR data at deposit | How a check clears today |
| Duplicate detection and Reg CC holds | Why checks are risky |
| X9.37 image file to the Fed or The Clearing House | Checks in one minute |
| Positive pay issue file and exceptions | Running it live |
| X9.37 return file and the midnight deadline | Running it live: returns |
More payment runbooks
- ACH payments
- Wire payments (Fedwire and CHIPS)
- Instant payments (RTP and FedNow)
- Card payments (debit, credit, prepaid)
- Cross-border payments over SWIFT
- Zelle for banks
- PayPal integration
- Embedded payments
The bottom line
Check delivery is about image quality, holds and fraud. Get those right, certify with every partner, and run support against the presentment deadline.
Working on a payments project?
I help banks and fintechs deliver real-time payments, ISO 20022, and AI-driven AML and compliance change, from strategy to go-live.
Connect on LinkedInSee how I can help