Insights Contact

Country Guides

Europe Payments Compared: UK Faster Payments, SEPA Instant and Switzerland

By SP Sankar

Flag of the United KingdomFlag of the European UnionFlag of GermanyFlag of FranceFlag of ItalyFlag of Switzerland

Europe has three big payment zones. The UK uses the pound. The euro area, including Germany, France and Italy, shares one currency and one set of payment schemes. Switzerland uses the Swiss franc. The UK got instant payments first, in 2008. The euro area made them standard by law in 2025. Switzerland launched them in 2024.

In all three, you can now send money in seconds, any time. The UK has Faster Payments. The euro area has SEPA Instant, which works the same from Paris to Rome. Switzerland has SIC instant payments, alongside the TWINT app.

Part of my Country Payment Guides series. Rules change often, so always confirm with the regulator before you build.

Europe at a glance

CountryCurrencyMain fast way to paySinceWho runs it
United KingdomPound sterling (GBP)Faster Payments2008Pay.UK (industry body), settled at the Bank of England
Euro area (incl. Germany, France, Italy)Euro (EUR)SEPA Instant Credit Transfer; Wero in Germany and France2017 (SEPA Instant), 2025 (required by law)European Payments Council scheme; settled in TIPS (ECB) or RT1 (private)
SwitzerlandSwiss franc (CHF)SIC instant payments; TWINT app2024 (instant payments)SIX Interbank Clearing for the Swiss National Bank

Germany, France and Italy share the euro, so one euro area guide covers them, with country notes for each. The UK and Switzerland have their own currencies and their own systems.

When fast payments arrived

The UK launched Faster Payments in 2008. The euro area followed with SEPA Instant in 2017 and the ECB’s TIPS in 2018, then used regulation in 2025 to make instant payments standard. Switzerland added instant payments to its SIC system in 2024.

When fast payments arrived in Europe2008: United Kingdom, Faster Payments goes live2008United Kingdom Faster Payments goes live2015: Switzerland, TWINT mobile payments2015Switzerland TWINT mobile payments2017: Euro area, SEPA Instant Credit Transfer scheme2017Euro area SEPA Instant Credit Transfer scheme2018: Euro area, TIPS, the ECB’s instant settlement service2018Euro area TIPS, the ECB’s instant settlement service2020: United Kingdom, Confirmation of Payee name checks2020United Kingdom Confirmation of Payee name checks2024: Germany and France, Wero app replaces giropay and Paylib2024Germany and France Wero app replaces giropay and Paylib2024: United Kingdom, Mandatory refunds for scam victims2024United Kingdom Mandatory refunds for scam victims2024: Switzerland, SIC instant payments, built with the central bank2024Switzerland SIC instant payments, built with the central bank2025: Euro area, Instant Payments Regulation and payee checks2025Euro area Instant Payments Regulation and payee checksIndustry schemeApp or consumer protectionCentral bank or law-led

Three ways to get to fast payments

ModelCountriesWhat it means for your product
Industry scheme with central bank settlementUnited KingdomOne national scheme (Faster Payments) run by Pay.UK; strong focus on scam refunds.
One scheme, many countries, required by lawEuro area (Germany, France, Italy and others)SEPA Instant works the same in every euro country; the EU Instant Payments Regulation makes banks offer it at no higher price than normal transfers.
Central bank system plus a popular appSwitzerlandSIC instant payments run for the Swiss National Bank; TWINT is how most people pay day to day.

What is the same everywhere

  • Payee name checks before you pay: Confirmation of Payee in the UK, Verification of Payee in the euro area.
  • ISO 20022 is the message standard for high-value and SEPA payments, and for Swiss SIC payments.
  • Local favorites remain: girocard in Germany, Cartes Bancaires in France, Bancomat in Italy and TWINT in Switzerland.
  • Fraud rules are tightening, with the UK leading on mandatory scam refunds.

Tips for payments teams entering the region

  1. In the UK, support Faster Payments and Confirmation of Payee.
  2. In the euro area, support SEPA Instant, Verification of Payee and local cards and apps (girocard, Cartes Bancaires, Bancomat, Wero).
  3. In Switzerland, support the QR-bill and TWINT.
  4. Use one SEPA build to reach all euro countries. Plan separate setups for pounds and Swiss francs.

The Nordic countries, Poland and other non-euro EU countries have their own currencies and instant systems. They aren’t covered here yet.

My take

Europe shows three routes to the same place: an industry scheme in the UK, a cross-border scheme backed by law in the euro area, and a central bank upgrade in Switzerland. For payments teams, that means instant by default, with payee checks, scam protection and local favorites built in.

Country guides

Other regions

Working on a payments project?

I help banks and fintechs deliver real-time payments, ISO 20022, and AI-driven AML and compliance change, from strategy to go-live.

Connect on LinkedInSee how I can help