
¥ CNY
China leads the world in mobile payments. Most people pay by scanning a QR code (a square barcode you scan with your phone) with Alipay or WeChat Pay. Behind those apps sits a tightly controlled system run by the central bank, with some of the world’s strictest data rules.
Part of my Country Payment Guides series. Rules change often, so always confirm with the regulator before you build.
This guide, step by step
- China at a glance
- How people pay in China
- How a payment moves in China
- Who regulates payments in China
- Rules by payment type in China
- Data and privacy rules in China
- AML, sanctions and fraud checks in China
- What is different about China
- Before you launch in China
Step 1: China at a glance
| Fact | Detail |
|---|---|
| Currency | Renminbi (RMB), counted in yuan (CNY) |
| Central bank | People’s Bank of China (PBOC) |
| Bank payment system | CNAPS (China National Advanced Payment System) |
| Mobile wallets | Alipay and WeChat Pay, cleared through NetsUnion |
| Cross-border RMB | CIPS (Cross-Border Interbank Payment System) |
Step 2: How people pay in China
| Payment type | What it is | Speed | Run by |
|---|---|---|---|
| HVPS (part of CNAPS) | High-value real-time gross settlement (each payment settled on its own, straight away) | Seconds | PBOC |
| BEPS (part of CNAPS) | Bulk, low-value batch payments | Same day | PBOC |
| IBPS | Online and mobile banking transfers, 24/7 | Seconds | PBOC |
| Mobile wallets | QR code payments with Alipay, WeChat Pay and others | Seconds | Licensed non-bank payment institutions, cleared by NetsUnion |
| UnionPay cards | Debit and credit cards | Seconds to approve | China UnionPay |
| CIPS | Cross-border payments in RMB | Same day | CIPS Co., under the PBOC |
| e-CNY | The central bank digital currency, in pilot | Instant | PBOC |
When each China rail started
China built its central bank systems and UnionPay in the 2000s, then mobile wallets took over everyday payments. Since 2018, wallet payments that touch bank accounts must go through a licensed clearing house.
Step 3: How a payment moves in China
Read the six boxes from left to right. The shopper scans the merchant’s QR code. The wallet checks the user and the risk. NetsUnion clears the payment between the wallet and the banks. The shopper’s bank account or wallet is debited, and the merchant is credited. The banks settle at the central bank. The bar shows the rule that makes all of this visible to the regulator.
Step 4: Who regulates payments in China
| Body | Role |
|---|---|
| People’s Bank of China | Central bank; runs CNAPS and IBPS; licenses non-bank payment institutions; AML supervisor |
| National Financial Regulatory Administration | Supervises banks and insurers |
| State Administration of Foreign Exchange | Foreign exchange rules and cross-border flows |
| Cyberspace Administration of China | Data and cyber rules, including data export |
| CAMLMAC | China’s financial intelligence unit (the agency that receives reports of suspicious payments), under the PBOC |
Step 5: Rules by payment type in China
Each way to pay has its own rulebook. This table shows the main laws and scheme rules, who enforces them, and what protects customers. It is a plain-language summary, not legal advice.
| Payment type | Main laws and rules | Who enforces | What protects customers |
|---|---|---|---|
| Bank transfers (CNAPS, IBPS) | People’s Bank of China (PBOC) payment and settlement rules | PBOC | Rules on transfer limits and fraud controls set by the PBOC |
| Mobile wallets (Alipay, WeChat Pay) | Regulations on the Supervision and Administration of Non-bank Payment Institutions (in force May 1, 2024) | PBOC | Customer money held at commercial banks; minimum capital of RMB 100 million |
| QR code payments | PBOC barcode payment rules (2018) | PBOC | Static merchant QR codes capped at RMB 500 per day |
| Bank cards (UnionPay and others) | PBOC bank card and card clearing rules | PBOC | Card clearing needs a PBOC license |
| Cross-border RMB | CIPS rules; foreign exchange rules | PBOC; State Administration of Foreign Exchange (SAFE) | Cross-border payments need documents that match the trade or purpose |
| Payment data | Personal Information Protection Law; Data Security Law | Cyberspace Administration of China (CAC); PBOC | Non-bank payment systems and backups must be kept in China |
Step 6: Data and privacy rules in China
- Three main laws: the Personal Information Protection Law (PIPL), the Data Security Law and the Cybersecurity Law.
- Personal financial information collected in China is generally stored in China.
- Sending personal data abroad needs a security assessment, a standard contract or a certification. The rules eased in March 2024, including an exemption for data truly needed for cross-border payments.
- Separate consent is required for sensitive data and for sending data abroad.
Step 7: AML, sanctions and fraud checks in China
Two terms first. AML (anti-money laundering) means stopping criminals from hiding dirty money in the payment system. Sanctions are government bans on dealing with certain people, companies or countries.
| Area | What applies |
|---|---|
| AML | The revised Anti-Money Laundering Law took effect on January 1, 2025: customer due diligence, large-value and suspicious transaction reports |
| Real-name rules | Accounts and wallets must be verified with real identity |
| Foreign exchange | Individuals have an annual quota for buying foreign currency, and business flows need supporting documents |
| Sanctions | UN sanctions plus China’s own counter-sanctions laws |
Step 8: What is different about China
- Wallet payments that touch bank accounts must go through a licensed clearing house, such as NetsUnion or UnionPay. Wallets can’t connect to banks directly.
- Non-bank payment institutions are licensed under PBOC regulations that took effect in May 2024.
- Foreign visitors can now link foreign cards to Alipay and WeChat Pay, and more merchants accept foreign cards.
- Customer funds held by payment institutions must be kept in full in reserve accounts.
For a foreign company, the hardest part is usually data, not payments. Plan where data is stored, and what can leave China, before you design the system.
Step 9: Before you launch in China
- Partner with a licensed local payment institution rather than building your own license.
- Design data storage in China first, then decide what can be sent abroad.
- Support QR code payments; cards alone won’t reach most shoppers.
- Plan foreign exchange documents for every cross-border business flow.
My take
China’s payments are fast, mobile and tightly controlled. Success here depends on the right local partners and on getting data rules right from day one.
Compare the region: see how India, Singapore, Japan and China each got to fast payments in Asia Payments Compared.
More country guides
- United States
- Canada
- Mexico
- United Kingdom
- Euro area (SEPA)
- Switzerland
- India
- Singapore
- Australia
- New Zealand
- Japan
- China (you are here)
- Brazil
- Argentina
- Chile
- Colombia
- Peru
- United Arab Emirates
- Saudi Arabia
- South Africa
- Nigeria
- Kenya
Working on a payments project?
I help banks and fintechs deliver real-time payments, ISO 20022, and AI-driven AML and compliance change, from strategy to go-live.
Connect on LinkedInSee how I can help